The Repair Process for Drilled Piers
Installing Piers
Atlas Foundation employees will locate pipes and electric wires. Plants
will be relocated from the areas where piers are to be drilled. At this
point, the process of drilling the piers can begin. As the piers are drilled,
a small amount of dirt will be kept to do the back filling where necessary.
All excess dirt will be hauled off. Access to water and electricity will
be necessary, but access to the inside of the house will not. Concrete
will be poured in all piers.
The Raising Process
After the concrete has cured for approximately seven days, jacks will
be placed on the piers. Excess or added mortar and caulking will be removed
to allow the bricks to return to their original positions. Elevations
will be taken before, during and after the lifting process. A 6"
diameter 5000 PSI concrete block, shimmed with metal plates, is placed
on the pier to support the foundation. The holes are then backfilled.
The mortar joints are repaired, the windows caulked, any concrete replaced,
any sprinkler system we damage is repaired and plants are replanted. All
areas are then washed or swept. Access to the inside of the house is necessary
during the raising process.
|
|